We use a combination of structural design, temperature control, filtration and maintenance guidance to minimize adhesive clogging caused by charring, impurities and incomplete melting. Our main measures include:
1. Independent temperature control: Each gun, hose and manifold zone uses closed-loop PID temperature control to prevent local overheating and low-temperature areas that can cause adhesive carbonization or solidification. Standby temperature settings are also available during short production stops.
2. Multi-level filtration: We arrange filters in the melter, hose inlet and gun manifold to intercept char particles and foreign impurities before they reach the nozzle. Filter elements are accessible for replacement.
3. Optimized internal flow channels: Smooth, low-resistance adhesive passages help reduce areas where residual glue can accumulate. Anti-stick surface treatment further limits adhesive residue.
4. Anti-drip and shut-off valves: High-response needle valves stop adhesive flow when spraying ends, reducing residual glue at the nozzle tip and the risk of solidification.
5. Factory testing and material matching: We test spray guns with different hot melt formulations and match nozzle orifice sizes according to adhesive viscosity and production line speed.
6. Maintenance guidance: Operation manuals cover routine purging, filter replacement, nozzle cleaning and adhesive draining before extended shutdowns. Remote technical guidance is also available to help customers address clogging issues.
PRODUCTS
CONTACT US
Tel: +86-18138645819
Add: Building I, Hongxing Road No.3 , Jiangmen City , Guangdong Province